Power plant supplier,
ABB Generation Ltd., entrusted us their transport of equipment to
Shunde Power Plant and Foshan Power Plant of China.
The pictures show how we discharged the equipment from arrival pier
onto the modified chassis and how the equipment was trucked to the
job site.
Apart from the overlength equipment, we managed to transport for
them the boiler which weighted 320 weight tons.